Bathroom installations in Bristol
Ready for a new bathroom? We'll plan the layout, choose the right suite and fittings, and build it properly so it works well for years. From a simple refresh to a full rewire and retile, we handle the lot.
What you get with every bathroom install
- Design advice and a plan showing layouts and fittings
- All plumbing, pipework and drainage work completed
- Tiling, flooring and wall finishes done to a high standard
- Electrical work certified and Building Regulations notified
Five reasons to upgrade your bathroom
A bathroom that works well makes a real difference to daily life. If yours is showing its age, or the layout doesn't suit how you use it, it might be time to plan something new.
Damp, mould or water damage
Black mould on walls and ceilings, or soft patches in the plaster, mean moisture isn't being cleared properly. A new bathroom with good ventilation stops it coming back.
Cracked tiles or leaks
Broken tiles let water seep behind them. Once the plaster gets wet, you've got a bigger problem than the crack. It's worth tackling it before more damage builds up.
Old suite or poor layout
A suite that's 20 or 30 years old, or a bathroom where the shower is awkwardly placed or the storage is tight, starts to feel dated and impractical.
Outdated electrics or plumbing
Old wiring, corroded pipes or plumbing that was patched rather than properly sorted can cause problems later. A new bathroom is a good time to bring it up to code.
Increasing home value
A modern, well-fitted bathroom is a big draw when buyers view a house. It's one of the best returns on a home improvement.
Suites, materials and finishes explained
A bathroom install is as much about choosing the right products as getting the plumbing and tiling right. We'll talk through the options and recommend what makes sense for your space and budget.
Suite layout and fixtures
We help plan where the toilet, basin and bath or shower go, and choose a suite that fits your space and style. Budget suites work well; premium ones offer better finishes.
- What affects the price
- Simple layouts cost less than moving waste pipes or radically altering wall positions
- Popular choices
- Straight baths, corner baths, walk-in showers, shower over bath, or wet rooms
Wall and floor tiles
The right tile protects walls from water and sets the look. Porcelain and ceramic are hardwearing. Larger tiles mean fewer grout lines and are easier to keep clean.
- Key decisions
- Tile size, finish (matt, gloss, textured), grout colour, and whether to tile the whole room or part of it
- Pro tip
- Waterproofing behind tiles in a shower area stops water getting trapped; it's worth the extra cost
Flooring and surfaces
Bathroom floors need to be waterproof and slip-resistant. Ceramic tile is the standard choice; stone, vinyl and natural materials are other options.
- Best materials
- Porcelain tile, natural stone, luxury vinyl, or polished concrete
- Watch out for
- Grout in wet areas can absorb water; epoxy grout or sealant stops damage
Extras that make a difference
Storage and mirrors
Built-in cabinets and mirrored storage keep clutter hidden and the room looking clean.
Lighting and ventilation
Good task lighting around the mirror and a properly sized fan prevents damp.
Heated towel rails
Practical, add warmth and help dry towels quickly in a damp room.
Underfloor heating
Warm feet on cold tiles make the bathroom much more comfortable.
A full bathroom installation covers
This is what goes into the quote, so you know exactly where your money is going before we start work.
- Site visit, measurements, planning and design advice
- Itemised quote naming the suite and all fittings to be used
- Removal of the old suite, tiles and fittings responsibly disposed of
- All pipework and plumbing work, including new soil and waste pipes if needed
- Water supply pipes fitted to the new basin, bath and shower
- Proper waterproofing in wet areas before tiling
- Wall and floor tiling to a high standard with appropriate grout and sealant
- Electrical work to new lights, extractor fan, and any heater or heated rail
- All electrics certified and notified to Building Control if needed
- Flooring fitted and sealed
- Snagging and final tidy-up of the space
From planning to a finished bathroom ready to use
A full bathroom install usually takes 5 to 10 working days, depending on the size and complexity. Here's what happens from start to finish.
-
Design and quote
We visit, measure the space, and draw up a plan showing where everything goes. We talk through the suite, tiles, colours and finishes, then give you a detailed written quote.
-
Stripping out
We remove the old suite, fittings and tiles carefully, so any pipes and walls we need to reuse aren't damaged. Everything is disposed of responsibly.
-
Plumbing and pipework
New water supply and waste pipes are run to the new basin, bath and shower. Soil pipes are sized and routed correctly so the drainage works properly.
-
Wall and floor prep
Surfaces are made level and flat. In wet areas we apply a proper waterproof membrane before any tiling begins.
-
Tiling and finishes
Tiles are laid to a true line with even grout gaps. Sealant is applied where needed, and flooring is fitted and sealed.
-
Electrics and ventilation
New circuits for lights, extract fan, and any heater are installed, tested and certified by a qualified electrician.
-
Final fittings and handover
The suite is installed, all taps and accessories are fitted and tested, and we show you how everything works. The space is cleaned and left tidy.
The factors that decide bathroom installation costs
Every bathroom is different, which is why we survey and quote rather than guess. These are the main things that change the price.
The size and layout
A simple small bathroom with the same layout as before costs less than moving pipes and creating a new floorplan.
The suite and fittings
A budget suite is half the price of a premium one. Taps, basins, towel rails and accessories add up quickly.
Tiles and finishes
Large-format porcelain tiles cost more than small ceramic, but need fewer grout lines. Specialty finishes add to the cost.
Wall and floor condition
If walls are uneven or floors need levelling, that takes extra work. Rotten plaster or damaged joists behind the old tiles will be discovered during stripping out.
Plumbing changes
Keeping pipes in the same place is cheaper than relocating soil pipes or moving the waste run significantly.
Electrical upgrades
New circuits, lights, extract fans and heaters all add labour. If the existing electrics are poor, an upgrade might be needed.
Extras
Underfloor heating, heated towel rails, storage built-ins and premium mirrors are priced separately.
Keeping your new bathroom in good condition
A well-installed bathroom needs minimal fuss. A few simple habits keep it looking fresh and protect against water damage.
- Ventilate after every shower. Run the extract fan for 20 minutes after bathing or showering to clear moisture. Open a window if you don't have a fan.
- Dry the shower tray or bath immediately. Wipe down glass doors and tiled walls after use so water doesn't sit and stain grout.
- Wipe down and dry the floor. Water pooling on tiles or sitting under the bath can seep behind them over time.
- Check seals and grout annually. If you spot gaps in grout or sealant, get them re-done before water gets behind the tiles.
- Don't ignore small leaks. A dripping tap or slow leak under the sink can rot plaster and wood if it's not fixed quickly.
- Avoid harsh bleach on grouted areas. It damages grout over time. Plain detergent and a soft brush work just as well.
Related services
Leak detection and pipe repairsFinding and fixing hidden leaks Boiler repairs and servicingAnnual services and fault diagnosis Emergency plumbingOut of hours call-outs, 24/7Bathroom installations near you
Bathroom installation questions, answered
Can't see your question here? Call us on 01225 123456 and we'll walk you through it.
How long does a bathroom installation take?
A full bathroom install usually takes 5 to 10 working days. The exact time depends on the size of the room, how much plumbing work is needed, and whether we discover any damage to walls or joists when we strip out the old suite. We'll give you an estimate when we quote, and keep you updated if anything unexpected comes up.
Do you tile the walls and floor?
Yes, tiling is included in our full bathroom installation service. We prepare the walls and floors, apply waterproofing in wet areas, and lay tiles to a high standard with proper grout and sealant. We use experienced tilers and match the quality of our plumbing work.
What about electrics and lighting?
We coordinate all new electrical work, including lights, extract fans, and heated towel rails. If you need a new circuit or any wiring, we work with a qualified electrician who tests everything and provides a Building Regulations certificate. The cost is included in the full quote.
Can you move the toilet or bath to a different position?
Yes, we can relocate them. Moving the soil pipe (from the toilet) is more involved and costs more than shifting the bath or basin. We assess the existing routes during the survey and tell you what's practical and what the extra work will cost.
What if you find rot or damaged walls during stripping out?
We'll stop, show you the damage, and discuss the best fix. Rotten plaster, soft joists or damaged timbers need sorting before we tile or finish. We'll give you a separate price for the remedial work so you know what to expect. It's another reason we survey properly before quoting.
Do you offer a guarantee on the work?
Yes. We guarantee our workmanship for 5 years on fixtures and fittings. We also guarantee that the plumbing and electrics are installed to current standards and are fully certified. The suite and fittings themselves carry the manufacturer's warranty, which we'll hand over to you.
Get a detailed quote for your bathroom install
We'll visit, measure up, and show you a plan with pricing. There's no callout charge, and you'll know the full cost before any work begins.